Rapid Deployment Site – A Tower in 1 Day
Rapid Site Models SG – 30 & SG – 42
CommStructures has designed and manufactured a temporary or permanent rapid deployment tower that can be installed in 1 day with or without the use of a revolutionary anchoring system.
Revolutionary SG Rapid Site
- Tower Size: 100 ft. or 140 ft.
- 2 Towers per flat 25,000 lbs. per (SG 30)
- SG Rapid Site can be completed in 1 or 2 days, Minimal equipment needed
- Foundation can be accomplished with CommStructures helical anchors or whatever is easily available for ballast, no need to disturb the soil
- Electrical easily installed with no trenching needed
- Civil work problems cut down significantly, no need to worry about soil conditions or water table
- All equipment installed directly on the base with no need for additional concrete slabs and long cable trays
- Security fence, foundation and tower bundled together
- Reduce your construction cost
- Reduce your construction timeline
- Relocate to another site fast
- Engineered and built to withstand the most demanding environments
For more information email jhobbs@commstructures.com